ALUMINUM

 

AMAGER RESSOURECENTER

MATERIAL

Aluminum alloy EN-AW 5083 with hardness H22 and H111.

 

CHOICE OF FACADE

The facade changes color throught the day and season. It has a rough finish and nice texture which contributes to the brick geometry of the facade.

 

INSPIRATION TO THE FAÇADE

We wanted something monocrome and calm that would not compete with the 5th facade – the lush green roof, and strengthen the geometry.

 

PROCESSING OF THE MATERIAL

Minor process. In general raw aluminum.

 

CHANGE OF THE MATERIAL

It will get a more grey’ish patina, and the reflection will decrease.

 

WATER DRAINAGE AND ROOF SAFETY

The bricks drains from each other and down. The facade works as railing on the roof.

ARC copenhill BIG bjarke Ingels group helsinki design week plootu19SPEAKER: Nanna Gyldholm Møller
PROJECT:
Amager Ressourcecenter (ARC), Copenhagen, Denmark
FINISHED YEAR: 2019 (including ski slope), Waste-to-Energy Plant finished since 2017
ARCHITECT: BIG

 

 

PHOTO: RASMUS HJORTSHOJ